Answer: Option D. -> None of the above
Answer: Option C. -> 1, 2 and 3 are correct
Answer: Option D. -> Critical activity is the one for which free float is zero.
Answer: Option C. -> Start float and finish float need not be equal
Answer: Option B. -> 5515 kg
Answer: Option A. -> Kneading
Answer: Option B. -> Project duration time
Answer: Option A. -> 2.3% and 84.1%