MCQs
Total Questions : 475
| Page 3 of 48 pages
Answer: Option C. -> Research and development projects
Answer: Option C. -> No, because of repetitive manufacture of a number of elements
Answer: Option A. -> 81
Answer: Option D. -> For all activities required to start the work at site on finalization of the contract document
Answer: Option D. -> Class is being attended
Answer: Option B. -> Variation in cost in materials element, labour element and petrol-oil-lubricant element
Answer: Option C. -> Beta distribution curve
Answer: Option B. -> Applying the theory' of probability to sample testing or inspection
Answer: Option D. -> The arrows are drawn to scale from left to right
Answer: Option D. -> All the above