Question 21. Which of the following is not a maturity level in CMM ?
  1.    Design
  2.    Repeatable
  3.    Managed
  4.    Optimizing
 Discuss Question
Answer: Option C. -> Managed
THE CMM IS ORGANIZED INTO FIVE MATURITY LEVELS AS NAMELY: INITIAL, REPEATABLE, DEFINED, MANAGED AND OPTIMIZING.
Question 22. ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
  1.    ISO 9001
  2.    ISO 9000-4
  3.    CMM
  4.    All of the mentioned
 Discuss Question
Answer: Option A. -> ISO 9001
ISO 9001 STATES THAT, WHERE, APPROPRIATE ADEQUATE STATISTICAL TECHNIQUES ARE IDENTIFIED AND USED TO VERIFY THE ACCEPTABILITY OF PROCESS CAPABILITY AND PRODUCT CHARACTERISTICS.
Question 23. Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
  1.    CMM
  2.    ISO 9001
  3.    ISO 9000-3
  4.    None of the mentioned
 Discuss Question
Answer: Option C. -> ISO 9000-3
ISO 9000-3 STATES THAT THE SUPPLIER SHOULD CARRY OUT REVIEWS TO ENSURE THE REQUIREMENTS ARE MET AND DESIGN METHODS ARE CORRECTLY CARRIED OUT.
Question 24. Which of the following is not a SQA plan for a project ?
  1.    evaluations to be performed
  2.    amount of technical work
  3.    audits and reviews to be performed
  4.    documents to be produced by the SQA group
 Discuss Question
Answer: Option B. -> amount of technical work
ALL OTHER OPTIONS SUPPORT A SQA PLAN
Question 25. The CMMI assessment is based on a x-point scale. What is the value of x ?
  1.    0
  2.    2
  3.    4
  4.    6
 Discuss Question
Answer: Option D. -> 6
NOT PERFORMED, PERFORMED, MANAGED, DEFINED, QUANTITATIVELY MANAGED, AND OPTIMIZING ARE THE SIX POINTS.
Question 26. It is always best to start process analysis with a new test model ?
  1.    True
  2.    False
 Discuss Question
Answer: Option B. -> False
IT IS ALWAYS BEST TO START PROCESS ANALYSIS WITH AN EXISTING MODEL. PEOPLE THEN MAY EXTEND AND CHANGE THIS.
Question 27. What is a tangible output of an activity that is predicted in a project plan ?
  1.    Deliverable
  2.    Activity
  3.    Condition
  4.    Process
 Discuss Question
Answer: Option A. -> Deliverable
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 28. Which of the following is not a part of process change ?
  1.    Introducing new practices, methods or processes
  2.    Introducing new team members to existing project
  3.    Introducing or removing deliverable
  4.    Introducing new roles or responsibilities
 Discuss Question
Answer: Option B. -> Introducing new team members to existing project
ADDING MORE DEVELOPERS AID TO PROCESS COMPLETION RATHER THAN CHANGING IT.
Question 29. Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ?
  1.    True
  2.    False
 Discuss Question
Answer: Option B. -> False
THE DEFINITION IS OF A SYSTEM DEVELOPMENT PROCESS.
Question 30. How many stages are there in process improvement ?
  1.    three
  2.    four
  3.    five
  4.    six
 Discuss Question
Answer: Option A. -> three
PROCESS MEASUREMENT, ANALYSIS AND CHANGE ARE THE THREE STAGES.