Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
Options:
A .  CMM
B .  ISO 9001
C .  ISO 9000-3
D .  None of the mentioned
Answer: Option C
ISO 9000-3 STATES THAT THE SUPPLIER SHOULD CARRY OUT REVIEWS TO ENSURE THE REQUIREMENTS ARE MET AND DESIGN METHODS ARE CORRECTLY CARRIED OUT.