Answer: Option B. -> The time when unit can run without any loss and profit
Answer: Option A. -> That can't be analysed mathematically
Answer: Option D. -> None of the above
Answer: Option D. -> Annuity charging method
Answer: Option B. -> Lowest possible cost and shortest possible time for project
Answer: Option A. -> Determine overhead expenses
Answer: Option D. -> All of these
Answer: Option D. -> All of the above