MCQs
Total Questions : 58
| Page 2 of 6 pages
Answer: Option A. -> The Department of Atomic Energy
Answer: (a).The Department of Atomic Energy
Answer: (a).The Department of Atomic Energy
Answer: Option A. -> Tarapur atomic power station
Answer: (a).Tarapur atomic power station
Answer: (a).Tarapur atomic power station
Answer: Option A. -> 441 TWh
Answer: (a).441 TWh
Answer: (a).441 TWh
Answer: Option C. -> 56.2%
Answer: (c).56.2%
Answer: (c).56.2%
Answer: Option B. -> 87%
Answer: (b).87%
Answer: (b).87%
Answer: Option C. -> 0.70
Answer: (c).0.70
Answer: (c).0.70
Question 17. 400 cumecs of water are being released from dam storage to meet the downstream demand through the turbines of the connected hydro plant. The effective head of water acting on the turbines is 50 m. The efficiency of the hydro plant is 0.8. The electrical power generated from this plant is __________________
Answer: Option C. -> 156.8 MW
Answer: (c).156.8 MW
Answer: (c).156.8 MW
Answer: Option A. -> Normal Water level
Answer: (a).Normal Water level
Answer: (a).Normal Water level
Answer: Option A. -> Pelton turbine
Answer: (a).Pelton turbine
Answer: (a).Pelton turbine
Answer: Option A. -> True
Answer: (a).True
Answer: (a).True