Total Questions : 551 | Page 9 of 56 pages
Question 81. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
  1.    1.00 m³
  2.    1.25 m³
  3.    1.50 m³
  4.    1.75 m³
 Discuss Question
Answer: Option B. -> 1.25 m³
Question 82. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
  1.    0.200 m³
  2.    0.247 m³
  3.    0.274 m³
  4.    0.295 m³
 Discuss Question
Answer: Option C. -> 0.274 m³
Question 83. Pick up the correct statement regarding the centre line method of estimating a building
  1.    Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
  2.    The centre line is worked out separately for different sections of walls of a building
  3.    The centre line length is reduced by half the layer of main wall joining the partition wall
  4.    All the above
 Discuss Question
Answer: Option D. -> All the above
Question 84. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
  1.    0.90 m³
  2.    0.94 m³
  3.    0.98 m³
  4.    1.00 m³
 Discuss Question
Answer: Option B. -> 0.94 m³
Question 85. The measurement is not made in square meters in case of
  1.    D.P.C. (Damp proof course)
  2.    Form works
  3.    Concrete Jeffries
  4.    R.C. Chhajja
 Discuss Question
Answer: Option D. -> R.C. Chhajja
Question 86. The brick work is measured in sq metre, in case of
  1.    Honey comb brick work
  2.    Brick flat soling
  3.    Half brick walls or the partition
  4.    All the above
 Discuss Question
Answer: Option D. -> All the above
Question 87. According to Indian Standards Institute, the actual size of modular bricks is
  1.    23 cm × 11.5 cm × 7.5 cm
  2.    25 cm × 13 cm × 7.5 cm
  3.    19 cm × 9 cm × 9 cm
  4.    20 cm × 10 cm × 10 cm
 Discuss Question
Answer: Option C. -> 19 cm × 9 cm × 9 cm
Question 88. Berms are provided in canals if these are
  1.    Fully in excavation
  2.    Partly in excavation and partly in embankment
  3.    Fully in embankment
  4.    All the above
 Discuss Question
Answer: Option B. -> Partly in excavation and partly in embankment
Question 89. The brick work is not measured in cu m in case of
  1.    One or more than one brick wall
  2.    Brick work in arches
  3.    Reinforced brick work
  4.    Half brick wall
 Discuss Question
Answer: Option D. -> Half brick wall
Question 90. While estimating a reinforced cement structure, the omitted cover of concrete is assumed
  1.    At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
  2.    In thin slabs, 12 mm minimum or diameter of the bar whichever is more
  3.    For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
  4.    All the above
 Discuss Question
Answer: Option D. -> All the above