MCQs
Total Questions : 47
| Page 4 of 5 pages
Answer: Option C. -> 10.5 m
Answer: (c).10.5 m
Answer: (c).10.5 m
Answer: Option D. -> 2.5 m
Answer: (d).2.5 m
Answer: (d).2.5 m
Answer: Option B. -> only the concrete is interrupted
Answer: (b).only the concrete is interrupted
Answer: (b).only the concrete is interrupted
Answer: Option C. -> PVC water bars
Answer: (c).PVC water bars
Answer: (c).PVC water bars
Answer: Option D. -> Construction joints
Answer: (d).Construction joints
Answer: (d).Construction joints
Answer: Option D. -> For siphoning small discharges, barrels are adopted
Answer: (d).For siphoning small discharges, barrels are adopted
Answer: (d).For siphoning small discharges, barrels are adopted
Answer: Option A. -> Aqueduct and Super passage
Answer: (a).Aqueduct and Super passage
Answer: (a).Aqueduct and Super passage
Answer: Option D. -> A siphon
Answer: (d).A siphon
Answer: (d).A siphon
Answer: Option B. -> Super passage and Syphon
Answer: (b).Super passage and Syphon
Answer: (b).Super passage and Syphon
Answer: Option B. -> aqueduct
Answer: (b).aqueduct
Answer: (b).aqueduct