Total Questions : 47 | Page 2 of 5 pages
Question 11. The crossing arrangement preferably made at the junction of a huge canal and a river stream carrying a short-lived high flood discharge at almost equal bed levels is a __________
  1.    super passage
  2.    aqueduct
  3.    level crossing
  4.    canal syphon
 Discuss Question
Answer: Option C. -> level crossing
Answer: (c).level crossing
Question 12. The drainage water is sometimes allowed to join the canal water to augment canal supplies through a hydraulic structure is called as ________________
  1.    canal outlet
  2.    canal inlet
  3.    module
  4.    level crossing
 Discuss Question
Answer: Option B. -> canal inlet
Answer: (b).canal inlet
Question 13. Which CD work is generally adopted when the drainage discharge is small and the drain crosses the canal with its bed level equal to or slightly higher than the canal FSL?
  1.    Syphon Aqueduct
  2.    Level crossing
  3.    Inlets and outlets
  4.    Aqueduct
 Discuss Question
Answer: Option C. -> Inlets and outlets
Answer: (c).Inlets and outlets
Question 14. In a syphon aqueduct provided with a pucca bottom floor, the uplift will occur on __________
  1.    the roof slab
  2.    the bottom floor
  3.    both the roof slab as well as the bottom floor
  4.    nowhere since the flow is free in the canal as well as in the drainage channel
 Discuss Question
Answer: Option B. -> the bottom floor
Answer: (b).the bottom floor
Question 15. Which of the following is a disadvantage of CD works carrying the canal over the discharge?
  1.    The damage caused by floods is not rare
  2.    The canal is not open for inspection and maintenance
  3.    The CD works are less liable to damage than the earthwork of the canal
  4.    During heavy floods, the foundations are susceptible to scour or waterway of the drain may get choked
 Discuss Question
Answer: Option D. -> During heavy floods, the foundations are susceptible to scour or waterway of the drain may get choked
Answer: (d).During heavy floods, the foundations are susceptible to scour or waterway of the drain may get choked
Question 16. The selection of the CD works depends on?
i. Selecting canal alignment
ii. Position of water-table and availability of dewatering equipment
iii. Suitability of soil for embankment
iv. Availability of funds
  1.    i and ii
  2.    i, ii and iv
  3.    i, ii and iii
  4.    i, ii, iii and iv
 Discuss Question
Answer: Option D. -> i, ii, iii and iv
Answer: (d).i, ii, iii and iv
Question 17. The type of canal alignment which involves maximum CD works is a ______________
  1.    ridge canal
  2.    contour canal
  3.    side slope canal
  4.    both ridge and contour canal
 Discuss Question
Answer: Option B. -> contour canal
Answer: (b).contour canal
Question 18. Inlets and Outlets are inferior to aqueduct or super-passage type of work.
  1.    True
  2.    False
  3.    May be True or False
  4.    Can't say
 Discuss Question
Answer: Option A. -> True
Answer: (a).True
Question 19. In order to reduce the CD works, the artificial canals are generally aligned along the ridgeline.
  1.    True
  2.    False
  3.    May be True or False
  4.    Can't say
 Discuss Question
Answer: Option A. -> True
Answer: (a).True
Question 20. What is Lacey’s equation for fixing the approximate value of the required waterway for the drain?
  1.    P = 4.75 Q
  2.    P = 4.57 Q
  3.    P = 4.75 Q^1/2
  4.    P = 4.57 Q^1/2
 Discuss Question
Answer: Option C. -> P = 4.75 Q^1/2
Answer: (c).P = 4.75 Q^1/2