A completes 80% of a work in 20 days. Then B also joins and A and B together finish the remaining work in 3 days. How long does it need for B if he alone completes the work?
Options:
A .  37 ½ days
B .  22 days
C .  31 days
D .  22 days
Answer: Option A
WORK DONE BY A IN 20 DAYS = 80/100 = 8/10 = 4/5
WORK DONE BY A IN 1 DAY = (4/5) / 20 = 4/100 = 1/25 — (1)
WORK DONE BY A AND B IN 3 DAYS = 20/100 = 1/5 (BECAUSE REMAINING 20% IS DONE IN 3 DAYS BY A AND B)
WORK DONE BY A AND B IN 1 DAY = 1/15 —(2)
WORK DONE BY B IN 1 DAY = 1/15 – 1/25 = 2/75
=> B CAN COMPLETE THE WORK IN 75/2 DAYS = 37 ½ DAYS