MCQs
Total Questions : 203
| Page 18 of 21 pages
Answer: Option A. -> soft ground
Answer: Option D. -> All the these.
Answer: Option D. -> All of the above.
Answer: Option A. -> 3,2,6,5,1,4
Answer: Option D. -> Firing of headholes is done just before the bench holes are fired:
Answer: Option D. -> 5 m to 6 m.
Answer: Option C. -> Removal of muck from the heading is very easy
Answer: Option D. -> All of the above.
Answer: Option D. -> All the above.