MCQs
Total Questions : 25
| Page 2 of 3 pages
Answer: Option B. -> Float before production
Answer: Option A. -> Parallel sequences
Answer: Option C. -> Repetitive manufacturing
Answer: Option B. -> Materials with smooth consumption pattern
Answer: Option D. -> All of the above
Answer: Option B. -> MD12
Answer: Option D. -> SAP Exchange Infrastructure (SAP XI) / SAP Process Integration (SAP PI)
Answer: Option C. -> 101
Answer: Option C. -> The Material Requirement Planning