Question 191. CPM has following time estimate
  1.    One time estimate
  2.    Two time estimate
  3.    Three time estimate
  4.    Four time estimate
 Discuss Question
Answer: Option A. -> One time estimate
Question 192. PERT has following time estimate
  1.    One time estimate
  2.    Two time estimate
  3.    Three time estimate
  4.    Four time estimate
 Discuss Question
Answer: Option C. -> Three time estimate
Question 193. The routing function in a production system design is concerned with
  1.    Manpower utilization
  2.    Quality assurance of the product
  3.    Machine utilization
  4.    Optimizing material flow through the plant
 Discuss Question
Answer: Option C. -> Machine utilization
Question 194. The two bin system is concerned with
  1.    Ordering procedure
  2.    Forecasting sales
  3.    Production planning
  4.    Despatching and expediting
 Discuss Question
Answer: Option A. -> Ordering procedure
Question 195. Work study is concerned with
  1.    Improving present method and finding standard time
  2.    Motivation of workers
  3.    Improving production capability
  4.    Improving production planning and control
 Discuss Question
Answer: Option A. -> Improving present method and finding standard time
Question 196. Activity slack or float of any event on a PERT/CPM chart is represented by
  1.    Latest start time of succeeding event earliest finish time of preceding event activity time
  2.    Latest start time of the event earliest start time of the event
  3.    Latest finish time of event earliest finish time of the event
  4.    Anyone of the above
 Discuss Question
Answer: Option D. -> Anyone of the above
Question 197. Acceptance sampling is widely used in
  1.    Batch production
  2.    Job production
  3.    Mass production
  4.    All of the above
 Discuss Question
Answer: Option C. -> Mass production
Question 198. Dummy activities are used to
  1.    Determine the critical path
  2.    Determine the project completion time
  3.    Maintain the required net work
  4.    None of these
 Discuss Question
Answer: Option C. -> Maintain the required net work
Question 199. The time which results in the least possible direct cost of an activity is known as
  1.    Normal time
  2.    Slow time
  3.    Crash time
  4.    Standard time
 Discuss Question
Answer: Option B. -> Slow time
Question 200. When slack of an activity is negative
  1.    It represents a situation where extra resources are available and the completion of project is not delayed
  2.    It represents that a programme falls behind schedule and additional resources are required to complete the project in time
  3.    The activity is critical and any delay in its performance will delay the completion of whole project
  4.    All of the above
 Discuss Question
Answer: Option B. -> It represents that a programme falls behind schedule and additional resources are required to complete the project in time