Question 491. The trap which is provided to disconnect the house drain from the street sewer is called_________________?
  1.    Master trap
  2.    Intercepting trap
  3.    Interception manhole
  4.    All the above
 Discuss Question
Answer: Option D. -> All the above
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 492. The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
  1.    Rs. 400
  2.    Rs. 425
  3.    Rs. 450
  4.    Rs. 500
 Discuss Question
Answer: Option C. -> Rs. 450
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 493. The measurement is not made in square metres in case of________________?
  1.    D.P.C. (Damp proof course)
  2.    Form works
  3.    Concrete Jeffries
  4.    R.C. Chhajja
 Discuss Question
Answer: Option D. -> R.C. Chhajja
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 494. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
  1.    2.0 %
  2.    2.5 %
  3.    4.0 %
  4.    5.0 %
 Discuss Question
Answer: Option D. -> 5.0 %
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 495. The most reliable estimate is_________________?
  1.    Detailed estimate
  2.    Preliminary estimate
  3.    Plinth area estimate
  4.    Cube rate estimate
 Discuss Question
Answer: Option A. -> Detailed estimate
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 496. The item of the brick structure measured in sq.m, is___________________?
  1.    Reinforced brick work
  2.    Broken glass coping
  3.    Brick edging
  4.    Brick work in arches
 Discuss Question
Answer: Option B. -> Broken glass coping
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 497. The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
  1.    2.5 sqm
  2.    5.0 sqm
  3.    7.5 sqm
  4.    10 sqm
 Discuss Question
Answer: Option C. -> 7.5 sqm
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 498. While preparing a detailed estimate__________________?
  1.    Dimension should be measured correct to 0.01 m
  2.    Area should be measured correct to 0.01 sqm
  3.    Volume should be measured correct to 0.01 cum
  4.    All the above
 Discuss Question
Answer: Option D. -> All the above
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 499. The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
  1.    (6 + 15) chains
  2.    (6 + 12) chains
  3.    (6 + 18) chains
  4.    None of these
 Discuss Question
Answer: Option B. -> (6 + 12) chains
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 500. Anti-siphonage pipe is connected to__________________?
  1.    Main soil pipe
  2.    Bottom of P trap W.C.
  3.    Top of P trap W.C.
  4.    Side of water closet
 Discuss Question
Answer: Option C. -> Top of P trap W.C.
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!