Sail E0 Webinar

MCQs

Total Questions : 72 | Page 3 of 8 pages
Question 21. Given that -1 ≤ v ≤ 1, -2 ≤ u ≤ -0.5, and -2 ≤ z ≤ -0.5 and w = vz/u, then which of the following is necessarily true?
  1.    -0.5 ≤ w ≤ -2
  2.    -4 ≤ w ≤ 4
  3.    -4 ≤ w ≤ 2
  4.    -2 ≤ w ≤ -0.5
 Discuss Question
Answer: Option B. -> -4 ≤ w ≤ 4




Question 22. Let A be a natural number consisting only 1. B is another natural number which is equal to quotient when A is divided by 13. C is yet another natural number equal to the quotient when B is divided by 7. Find B-C.
  1.    7236
  2.    7362
  3.    7326
  4.    None of these
 Discuss Question
Answer: Option C. -> 7326




Question 23. Two men X and Y started working for a certain company at similar jobs on January 1, 1950. X asked for an initial salary of Rs. 300 with an annual increment of Rs. 30. Y asked for an initial salary of Rs. 200 with a rise of Rs. 15 every 6 months. Assume that the arrangements remained unaltered till December 31, 1959. Salary is paid on the last day of the month. What is the total amount paid to them as salary during the period?
  1.    Rs. 93,300
  2.    Rs. 93,200
  3.    Rs. 93,100
  4.    None of these
 Discuss Question
Answer: Option A. -> Rs. 93,300




Question 24. A rectangular sheet of paper, when halved by folding it at the midpoint of its longer side, results in a rectangle, whose longer and shorter sides are in the same proportion as the longer and shorter sides of the original rectangle. If the shorter side of the original rectangle is 2, what is the area of the smaller rectangle?
  1.    4√2
  2.    2√2
  3.    √2
  4.    None of the above
 Discuss Question
Answer: Option B. -> 2√2




Question 25. A can complete a piece of work in 4 days. B takes double the time taken by A, C takes double that of B, and D takes double that of C to complete the same task. They are paired in groups of two each. One pair takes two-thirds the time needed by the second pair to complete the work. Which is the first pair?
  1.    A and B
  2.    A and C
  3.    B and C
  4.    A and D
 Discuss Question
Answer: Option D. -> A and D




Question 26. Let f : R ? R be a function defined by f(x) = max. {x, x3}. The set of all points where f(x) is not differentiable is
  1.    {-1, 1}
  2.    {-1, 0}
  3.    {0, 1}
  4.    {-1, 0, 1}
 Discuss Question
Answer: Option D. -> {-1, 0, 1}




Question 27. Find the number of ways you can fill a 3 x 3 grid (with 4 corners defined as a, b, c, d), if you have 3 white marbles and 6 black marbles.
  1.    75
  2.    84
  3.    80
  4.    None of these
 Discuss Question
Answer: Option B. -> 84




Question 28. A biker notices a certain number(2 digits number) on the milestone before starting the journey. After riding for an hour he notices a milestone with reversed digits of the previous number. Now after riding for another hour he notices that the number on a new milestone had same digits as the first one (in the same order) but with a "0" between the 2 digits. If the rider maintains a constant speed throughout, Calculate his speed.
  1.    45 kmph
  2.    50 kmph
  3.    35 kmph
  4.    None of these
 Discuss Question
Answer: Option A. -> 45 kmph




Question 29. If 1/a + 1/b + 1/c = 1 / (a + b + c); where a + b + c 1 0; abc 1 0, then what is the value of ( a + b ) ( b + c ) ( c + a )?
  1.    Equal to 0
  2.    Greater than 0
  3.    Less than 0
  4.    Cannot be determined
 Discuss Question
Answer: Option A. -> Equal to 0




Question 30. PT Usha and Shelly John decide to run a marathon between Ramnagar and Jamnagar. Both start from Ramnagar at 1 pm. On the way are two towns Ramgarh and Rampur, separated by a distance of 15 km. PT Usha reaches Ramgarh in 90 minutes running at a constant speed of 40 kmph. She takes additional 30 minutes to reach Rampur. Between Rampur and Jamnagar she maintains an average speed of V kmph (where V is a whole number),Shelly John being a professional marathon runner, maintains a constant speed of 18 kmph. They both reach Jamnagar together after 'n' hours, 'n' being a whole number. What could be total time taken by PT Usha?
  1.    5 hours
  2.    15 hours
  3.    41 hours
  4.    All of the above
 Discuss Question
Answer: Option A. -> 5 hours




Latest Videos

Latest Test Papers