Question 34. The boiling process has wide-spread applications in
(i) Production of steam in nuclear and steam power plants for generation and for industrial processes and space heating
(ii) Absorption of heat in refrigeration and air-conditioning systems
(iii) Concentration, dehydration and drying of foods and materials
Identify the correct statements
(i) Production of steam in nuclear and steam power plants for generation and for industrial processes and space heating
(ii) Absorption of heat in refrigeration and air-conditioning systems
(iii) Concentration, dehydration and drying of foods and materials
Identify the correct statements
Answer: Option C. -> 1, 2 and 3
Answer: (c).1, 2 and 3
Answer: (c).1, 2 and 3
Answer: Option C. -> Forced convection
Answer: (c).Forced convection
Answer: (c).Forced convection
Answer: Option A. -> 1800
Answer: (a).1800
Answer: (a).1800
Question 37. A condenser is to be designed to condense 225.0 kg of steam per hour at a pressure of 0.15 bar. A square array of 400 tubes, each of 6 mm in diameter, is available for the task. If the tube surface temperature is to be maintained at 26 degree Celsius, make calculations for the length of the tube
Answer: Option D. -> 1.353 m
Answer: (d).1.353 m
Answer: (d).1.353 m
Answer: Option C. -> 19879 W
Answer: (c).19879 W
Answer: (c).19879 W
Answer: Option A. -> 4 m/δ b
Answer: (a).4 m/δ b
Answer: (a).4 m/δ b
Answer: Option D. -> 4 δ
Answer: (d).4 δ
Answer: (d).4 δ