Sail E0 Webinar

MCQs

Total Questions : 143 | Page 9 of 15 pages
Question 81. In linear combing, linear comb works on tuft's
  1.    sides
  2.    tail
  3.    front
  4.    back
 Discuss Question
Answer: Option B. -> tail
Answer: (b).tail
Question 82. Finisher drawframe is equipped with
  1.    leveler
  2.    autoleveller
  3.    finisher
  4.    string
 Discuss Question
Answer: Option B. -> autoleveller
Answer: (b).autoleveller
Question 83. In finisher drawframe, there is a device which helps in collecting the
  1.    combed sliver
  2.    sliver can
  3.    sliver fed
  4.    sliver tuft
 Discuss Question
Answer: Option A. -> combed sliver
Answer: (a).combed sliver
Question 84. Two doubling and drawing steps are carried out inside
  1.    2 intersecting frames
  2.    3 intersecting frames
  3.    4 intersecting frames
  4.    5 intersecting frames
 Discuss Question
Answer: Option A. -> 2 intersecting frames
Answer: (a).2 intersecting frames
Question 85. Full can is taken from working position to press to
  1.    form the bump
  2.    bind the bump
  3.    twist and bind the bump
  4.    form and bind the bump
 Discuss Question
Answer: Option D. -> form and bind the bump
Answer: (d).form and bind the bump
Question 86. Slivers emerging from linear combing are made up of tufts whose fibers are
  1.    overlapping
  2.    tied by friction
  3.    tied by resistance
  4.    short
 Discuss Question
Answer: Option B. -> tied by friction
Answer: (b).tied by friction
Question 87. Can, can be changed with help of a
  1.    conveyor
  2.    rod
  3.    cylinder
  4.    rotator
 Discuss Question
Answer: Option A. -> conveyor
Answer: (a).conveyor
Question 88. Slivers tied together due to friction are
  1.    poorly compacted
  2.    irregular
  3.    random
  4.    all of above
 Discuss Question
Answer: Option D. -> all of above
Answer: (d).all of above
Question 89. Intersecting frames used for two doubling and drawing steps are called as
  1.    can emptier and finisher drawframes
  2.    double can emptier drawframes
  3.    double finisher drawframes
  4.    delta drawframes
 Discuss Question
Answer: Option A. -> can emptier and finisher drawframes
Answer: (a).can emptier and finisher drawframes
Question 90. In order to get rid of poor compactness and irregularity of sliver emerging form linear combing, slivers must undergo
  1.    doubling and drawing
  2.    2 doubling and drawing steps
  3.    3 doubling and drawing steps
  4.    4 doubling and drawing steps
 Discuss Question
Answer: Option B. -> 2 doubling and drawing steps
Answer: (b).2 doubling and drawing steps

Latest Videos

Latest Test Papers