Question
The following operations are required for tunnelling in rocky terrain :
1. Removing the foul gases
2. Marking the tunnel profile
3. Setting up and drilling
4. Checking misfire
5. Mucking
The correct sequence is :
1. Removing the foul gases
2. Marking the tunnel profile
3. Setting up and drilling
4. Checking misfire
5. Mucking
The correct sequence is :
Answer: Option D
Answer: (d).2 3 1 4 5
Was this answer helpful ?
Answer: (d).2 3 1 4 5
Was this answer helpful ?
More Questions on This Topic :
Question 6.
An overhead track on a large truss frame is ....
Question 8.
Pick up the explosive used for tunnelling in....
Question 9.
Railway tunnels, are generally
....
Submit Solution