A can do half of a piece of work in 1 day,where B can do full. B can do half the work as C in 1 day. The ratio of their efficiencies of work is = ?
Options:
A .  1 : 2 : 4
B .  2 : 1 : 4
C .  4 : 2 : 1
D .  2 : 4 : 1
Answer: Option A