A and B can finish a piece of work in 20 days .B and C in 30 days and C and A in 40 days. In how many days will A alone finish the job?
Options:
A .  48
B .  34(2/7)
C .  44
D .  45
Answer: Option A
(1/A)+(1/B) = (1/20) (1/B)+(1/C) = (1/30) (1/A)+(1/C) = (1/40) SOLVING THE THREE EQUATIONS,
A=48