Question 291. Queuing theory is associated with
  1.     Sales
  2.     Inspection time
  3.     Waiting time
  4.     Production time
 Discuss Question
Answer: Option C. ->  Waiting time
Explanation :
Question 292. Work study is mainly aimed at
  1.     Determining the most efficient method of performing a job
  2.     Establishing the minimum time of completion of a job
  3.     Developing the standard method and standard time of a job
  4.     Economizing the motions involved on the part of the worker while performing a job
 Discuss Question
Answer: Option A. ->  Determining the most efficient method of performing a job
Explanation :
Question 293. A company spends considerable amount on publicity to promote sales. this expenditure in break even chart is shown below the
  1.     Fixed cost line
  2.     Variable cost line
  3.     Total cost line
  4.     Sales revenue line
 Discuss Question
Answer: Option B. ->  Variable cost line
Explanation :
Question 294. Scheduling
  1.     Prescribes the sequence of operations to be followed
  2.     Determines the programme for the operations
  3.     Is concerned with starting of processes
  4.     Regulates the progress of job through various processes
 Discuss Question
Answer: Option B. ->  Determines the programme for the operations
Explanation :
Question 295. 'value' for value engineering and analysis purposes is defined as
  1.     Purchase value
  2.     Saleable value
  3.     Depreciated value
  4.     Function/cost
 Discuss Question
Answer: Option D. ->  Function/cost
Explanation :
Question 296. Choose the wrong statement. motion study is used for
  1.     Improving a work method
  2.     Improvising a work method
  3.     Designing a work method
  4.     Reducing inventory costs
 Discuss Question
Answer: Option D. ->  Reducing inventory costs
Explanation :
Question 297. Pert analysis is based upon
  1.     Optimistic time
  2.     Pessimistic time
  3.     Most likely time
  4.     All of these
 Discuss Question
Answer: Option D. ->  All of these
Explanation :
Question 298. Value engineering aims at finding out the
  1.     Depreciation value of a product
  2.     Resale value of a product
  3.     Major function of the item and accomplishing the same at least cost without change in quality
  4.     Break-even point when machine requires change
 Discuss Question
Answer: Option C. ->  Major function of the item and accomplishing the same at least cost without change in quality
Explanation :
Question 299. Product layout is employed for
  1.     Batch production
  2.     Continuous production
  3.     Effective utilization of machine
  4.     All of the above
 Discuss Question
Answer: Option B. ->  Continuous production
Explanation :
Question 300. Abbreviated work factor data is applied for
  1.     Material handling operation
  2.     Maintenance operation
  3.     Packing and shipping operation
  4.     All of these
 Discuss Question
Answer: Option D. ->  All of these
Explanation :