MCQs
Total Questions : 1156
| Page 6 of 116 pages
Answer: Option C. -> through a set of layers to the subgrade
Answer: Option D. -> 98 “”percentile
Answer: Option B. -> Go or green time of a signal is the sum of stop and clearance intervals for the cross flow.
Answer: Option C. -> condition diagram
Answer: Option D. -> smooth and wet
Answer: Option B. -> 60m
Answer: Option B. -> An empirical method based on physical properties of sub-grade soil
Answer: Option D. -> half the longitudinal gradient
Answer: Option B. -> cubic parabola
Answer: Option A. -> level crossing