Answer: Option A. -> Sides and proceed to center
Answer: Option B. -> in roadways meant for two way traffic
Answer: Option B. -> Catch-water drain
Answer: Option B. -> CBR method
Answer: Option B. -> 2.44 m
Answer: Option A. -> Sprayed after the aggregates are spread and compacted
Answer: Option C. -> Second 20-year plan has provided 1600 km of expressways out of the proposed National highway.
Answer: Option C. -> diverging to the right side and merging from right
Answer: Option C. -> 1500 tonnes per day