Which of the following is not a method for dam construction when a shear zone is encountered?
Options:
A .  Construct on shear zone
B .  Grouting the shear zones
C .  Try and avoid the site as much as possible
D .  Excavation and back filling
Answer: Option A
Answer: (a).Construct on shear zone