MCQs
Total Questions : 203
| Page 5 of 21 pages
Question 41. For transferring the tunnel alignment through shafts, we adopt the following steps: 1.Hanging two or more plumb lines in the shaft2.Determining the bearing of the plumb lines i.e. plumb plane3.Suspending a 35 kg weight by each plumb line4.Immersing the weights of both the plumb lines in the buckets containing waterThe correct sequence of steps is:
Answer: Option A. -> 1, 2, 3, 4
Answer: Option C. -> Tunneling can be continuous and the work can be expedited
Answer: Option B. -> Liner plate
Answer: Option D. -> All the above
Answer: Option C. -> Removal of muck from the heading is very easy
Answer: Option D. -> Firing of head holes is done just before the bench holes are fired
Answer: Option A. -> The grass hopper method
Answer: Option D. -> 1, 6, 2, 5, 3, 4, 7
Answer: Option D. -> All the above
Answer: Option C. -> Ammonia dynamite