Question 91. COCOMO stands for____________________?
  1.    Constructive cost model
  2.    Comprehensive cost model
  3.    Constructive cost estimation model
  4.    Complete cost estimation model
 Discuss Question
Answer: Option A. -> Constructive cost model
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 92. COCOMO was developed initially by _____________________ ?
  1.    B.Beizer
  2.    Rajiv Gupta
  3.    B.W.Bohem
  4.    Gregg Rothermal
 Discuss Question
Answer: Option C. -> B.W.Bohem
BARRY BOEHM INTRODUCED A HIERARCHY OF SOFTWARE ESTIMATION MODELS BEARING THE NAME COCOMO, FOR CONSTRUCTIVE COST MODEL
Question 93. Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
  1.    Early design stage model
  2.    Post-architecture-stage model
  3.    Application composition model
  4.    All of the mentioned
 Discuss Question
Answer: Option C. -> Application composition model
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 94. Which one is not a risk management activity ?
  1.    Risk assessment
  2.    Risk generation
  3.    Risk control
  4.    None of the mentioned
 Discuss Question
Answer: Option B. -> Risk generation
RISK MANAGEMENT ACTIVITIES WOULD NEVER WANT A NEW RISK TO BE GENERATED.
Question 95. Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
  1.    Early design stage model
  2.    Post-architecture-stage model
  3.    Application composition model
  4.    All of the mentioned
 Discuss Question
Answer: Option A. -> Early design stage model
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 96. Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
  1.    FP-Based Estimation
  2.    Process-Based Estimation
  3.    COCOMO
  4.    Both FP-Based Estimation and COCOMO
 Discuss Question
Answer: Option D. -> Both FP-Based Estimation and COCOMO
FUNCTION POINTS AND COCOMO ARE USED TO EVALUATE EFFORT.
Question 97. Which one is not a size measure for software product ?
  1.    LOC
  2.    Halstead’s program length
  3.    Function Count
  4.    Cyclomatic Complexity
 Discuss Question
Answer: Option D. -> Cyclomatic Complexity
IT IS THE PART OF WHITE BOX TESTING.
Question 98. Estimation of size for a project is dependent on___________________?
  1.    Cost
  2.    Time
  3.    Schedule
  4.    None of the mentioned
 Discuss Question
Answer: Option D. -> None of the mentioned
ESTIMATION DEPENDS ON FACTORS SUCH AS FUNCTION POINTS AND LOC.
Question 99. COCOMO-II was developed at _____________________?
  1.    University of Texas
  2.    University of Southern California
  3.    MIT
  4.    IIT-Kanpur
 Discuss Question
Answer: Option B. -> University of Southern California
NO EXPLANATION IS AVAILABLE FOR THIS QUESTION!
Question 100. What all has to be identified as per risk identification ?
  1.    Threats
  2.    Vulnerabilities
  3.    Consequences
  4.    All of the mentioned
 Discuss Question
Answer: Option D. -> All of the mentioned
RISK IDENTIFICATION STATES WHAT COULD CAUSE A POTENTIAL LOSS.