Question 51. Software inspection is
  1.    It is concern with modification of existing system to meet changing requirements.
  2.    It is a process of converting system specifications into an executable system.
  3.    It analyzes and checks system representation such as the requirements document, design diagrams and program source code.
  4.    None of these
 Discuss Question
Answer: Option A. -> It is concern with modification of existing system to meet changing requirements.
Answer: (a)
Question 52. Software process is
  1.    A set of activities and associated results that produce a software product
  2.    It is concerned with re-implementing legacy system to make them more maintainable.
  3.    It is the official statement of what is required of the system developers; it includes uses requirements for a system and detailed specification of the system requirements
  4.    None of these.
 Discuss Question
Answer: Option A. -> A set of activities and associated results that produce a software product
Answer: (a)
Question 53. These objects can be realized as parallel process with method corresponding to defined object operations.
  1.    Self-descriptiveness
  2.    Servers
  3.    Simplicity
  4.    None of these
 Discuss Question
Answer: Option B. -> Servers
Answer: (b)
Question 54. Risk is
  1.    The probability that the system will cause an accident
  2.    Extent to which a system or component can function correctly in the presence of invalid inputs or stressful environment conditions.
  3.    The frequency of occurrence with which unexpected behavior is likely to occur.
  4.    None of these
 Discuss Question
Answer: Option A. -> The probability that the system will cause an accident
Answer: (a)
Question 55. Software specification is
  1.    Associated with functionality of software and constraints of operations defined.
  2.    It consists of computer programs, configuration files that are used to set up these programs system documentation for describing to structure of the system and used documentation that describes use of the system.
  3.    It involves executing an implementation of the software with test data and examines the outputs of the software and its operational behavior to check that it is performing as required
  4.    None of these
 Discuss Question
Answer: Option A. -> Associated with functionality of software and constraints of operations defined.
Answer: (a)
Question 56. It is responsible for deciding when the system can be released to customers, managing the process of creating the release and distribution media and documenting the release.
  1.    System procurement
  2.    System quality assessment
  3.    System release management
  4.    System reliability
 Discuss Question
Answer: Option C. -> System release management
Answer: (c)
Question 57. Clean room software development
  1.    One system is designed as the system controller and has responsibility for managing the execution of other subsystems.
  2.    Each system is named as in attribute based identification and associated with one or more change requests.
  3.    An object class inheritance diagram, how entities have common characteristics.
  4.    The objective is to develop zero-defect software.
 Discuss Question
Answer: Option D. -> The objective is to develop zero-defect software.
Answer: (d)
Question 58. Match the following : A- Error handling : B-Error proneness: C- Error tolerance:: 1- Extent to which a system or component to continue normal operation despite the presence of erroneous inputs.: 2- Extent to which a system allowed the user, to intentionally or unintentionally introduce errors into or misuse the system.: 3- Function of a computer system/ component that identify and respond to user or system errors to maintain normal or at the very least degraded operations.
  1.    A-3,B-2,C-1
  2.    A-1,B-2,C-3
  3.    A-2,B-1,C-3
  4.    None of these
 Discuss Question
Answer: Option A. -> A-3,B-2,C-1
Answer: (a)
Question 59. Hazard probability
  1.    Hazard cannot arise due system design.
  2.    The probability of the event occurring which create a hazard.
  3.    An assessment of the worst possible damage, which could result from a particular hazard.
  4.    A condition with the potential for causing or contributing to an accident.
 Discuss Question
Answer: Option B. -> The probability of the event occurring which create a hazard.
Answer: (b)
Question 60. Process analysis
  1.    Trustworthiness with which a system are transferred from one hardware environment to another
  2.    Here one sub system encapsulates a set of procedures, which can be called by other sub-systems.
  3.    It is concerned with studying existing process to understand the relationship between different parts of the process.
  4.    None of these
 Discuss Question
Answer: Option C. -> It is concerned with studying existing process to understand the relationship between different parts of the process.
Answer: (c)

Latest Videos

Latest Test Papers