Sail E0 Webinar

MCQs

Total Questions : 24 | Page 2 of 3 pages
Question 11. Which is true regarding physical-sample drawing
  1.    Physical-sample drawing can be subject to a separate confirmation process using a sample scheme
  2.    Physical-sample drawing cannot be subject to a separate confirmation process as it is integral part of the whole process
  3.    Physical-sample drawing can be subject to a separate confirmation process using a status scheme
  4.    No separate confirmation process can be applied to physical-sample drawing unless and until it is a failed case
 Discuss Question
Answer: Option C. -> Physical-sample drawing can be subject to a separate confirmation process using a status scheme




Question 12. With reference to Multiple Specifications in Inspection Planning, which of the following statements are true?
  1.    Multiple specifications must be stored in an inspection plan
  2.    You cannot create multiple specifications using the Engineering Workbench (EWB)
  3.    You can create the multiple specifications in a new inspection plan, but not on an existing inspection plan
  4.    You need to define object types permitted for multiple specifications, but not objects for each object types
 Discuss Question
Answer: Option A. -> Multiple specifications must be stored in an inspection plan




Question 13. QMP means
  1.    Quality Management Performance
  2.    Quality Management Principle
  3.    Quality Management Plan
  4.    None
 Discuss Question
Answer: Option C. -> Quality Management Plan




Question 14. There are ____ quality principles
  1.    10
  2.    5
  3.    8
  4.    19
 Discuss Question
Answer: Option C. -> 8




Question 15. The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process?
  1.    Sampling Scheme
  2.    Sampling Procedure
  3.    Dynamic Modification Rule
  4.    Sampling Condition
 Discuss Question
Answer: Option D. -> Sampling Condition




Question 16. You want to record defects in inspection lot processing. In the Implementation Guide (IMG), which elements can you combine in a defect report type?
  1.    Confirmation Profile, Catalog Profile, Notification Type
  2.    Confirmation Profile, Defect Class, Origin of the Catalog Profile
  3.    Confirmation Profile, Catalog Profile, Defect Type, Work Center
  4.    Confirmation Profile, Catalog Profile, Origin of the Catalog Profile
 Discuss Question
Answer: Option A. -> Confirmation Profile, Catalog Profile, Notification Type




Question 17. Which type of task list defines process steps independently of the inspection lot?
  1.    Routing
  2.    Inspection plan
  3.    Reference object set
  4.    Master recipe
 Discuss Question
Answer: Option D. -> Master recipe




Question 18. The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process?
  1.    Sampling Scheme
  2.    Sampling Procedure
  3.    Dynamic Modification Rule
  4.    Sampling Condition
 Discuss Question
Answer: Option D. -> Sampling Condition




Question 19. QM Standard forms are displayed by using
  1.    QCCM
  2.    QCCN
  3.    QCCF
  4.    None
 Discuss Question
Answer: Option C. -> QCCF




Question 20. During an audit, you document a finding. In the audit structure, what can link an audit and a quality notification?
  1.    Corrective/preventive action
  2.    Audit question
  3.    Business partner
  4.    Attached document
 Discuss Question
Answer: Option A. -> Corrective/preventive action




Latest Videos

Latest Test Papers