Question 71. Material handling in automobile industry is done by
  1.     Overhead crane
  2.     Trolley
  3.     Belt conveyor
  4.     All of the above
 Discuss Question
Answer: Option A. ->  Overhead crane
Explanation :
Question 72. The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
  1.     Inflated system
  2.     Primary cost method
  3.     Current value method
  4.     Fixed price method
 Discuss Question
Answer: Option A. ->  Inflated system
Explanation :
Question 73. A systematic job improvement sequence will consist of
  1.     Motion study
  2.     Time study
  3.     Job enrichment
  4.     All of these
 Discuss Question
Answer: Option D. ->  All of these
Explanation :
Question 74. Replacement studies are made on the following basis
  1.     Annual cost method
  2.     Rate of return method
  3.     Total life average method
  4.     Any one of the above
 Discuss Question
Answer: Option D. ->  Any one of the above
Explanation :
Question 75. The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
  1.     Product layout
  2.     Process layout
  3.     Fixed position layout
  4.     A combination of line and process layout
 Discuss Question
Answer: Option A. ->  Product layout
Explanation :
Question 76. Inventory management consists of
  1.     Effective running of stores
  2.     State of merchandise methods of storing and maintenance etc.
  3.     Stock control system
  4.     All of the above
 Discuss Question
Answer: Option D. ->  All of the above
Explanation :
Question 77. Expediting function consists in keeping a watch on
  1.     Operator's activity
  2.     Flow of material and in case of trouble locate source of trouble
  3.     Minimizing the delays
  4.     Making efficient dispatching
 Discuss Question
Answer: Option B. ->  Flow of material and in case of trouble locate source of trouble
Explanation :
Question 78. The aim of value engineering is to
  1.     Find the depreciation value of a machine
  2.     Determine the selling price of a product
  3.     Minimize the cost without change in quality of the product
  4.     All of the above
 Discuss Question
Answer: Option C. ->  Minimize the cost without change in quality of the product
Explanation :
Question 79. One time measurement unit (tmu) in method time measurement system equals
  1.     0.0001 minute
  2.     0.0006 minute
  3.     0.006 minute
  4.     0.001 minute
 Discuss Question
Answer: Option B. ->  0.0006 minute
Explanation :
Question 80. Merit rating is the method of determining worth of
  1.     A job
  2.     An individual employee
  3.     A particular division in workshop
  4.     Machine
 Discuss Question
Answer: Option B. ->  An individual employee
Explanation :