Question 11. Knowing the lithology of the site is very important in terms of its safety and feasibility.
  1.    True
  2.    False
  3.    May be True or False
  4.    Can't say
 Discuss Question
Answer: Option A. -> True
Answer: (a).True
Question 12. Depending on the purpose of storage, reservoirs are classified into how many types?
  1.    2
  2.    4
  3.    3
  4.    5
 Discuss Question
Answer: Option C. -> 3
Answer: (c).3
Question 13. The reservoirs for small storage and short period of time are __________
  1.    Storage and conservation reservoirs
  2.    Flood control reservoirs
  3.    Distribution reservoirs
  4.    Drought control reservoirs
 Discuss Question
Answer: Option C. -> Distribution reservoirs
Answer: (c).Distribution reservoirs
Question 14. Volume of water in cubic meters available between minimum pool level and normal pool level is __________
  1.    Useful storage
  2.    Dead storage
  3.    Surcharge storage
  4.    Specific storage
 Discuss Question
Answer: Option A. -> Useful storage
Answer: (a).Useful storage
Question 15. The level up to which the reservoir shall be full of water is called __________
  1.    High level
  2.    Maximum level
  3.    Pool level
  4.    Surface level
 Discuss Question
Answer: Option C. -> Pool level
Answer: (c).Pool level
Question 16. The measure of the volume of water that can be drawn from a given reservoir in a certain interval of time is called __________
  1.    Surface yield
  2.    Drawable yield
  3.    Reservoir yield
  4.    Pool yield
 Discuss Question
Answer: Option C. -> Reservoir yield
Answer: (c).Reservoir yield
Question 17. Reservoirs involving large sluice gates are __________
  1.    Storage and conservation reservoirs
  2.    Flood control reservoirs
  3.    Distribution reservoirs
  4.    Drought control reservoirs
 Discuss Question
Answer: Option B. -> Flood control reservoirs
Answer: (b).Flood control reservoirs
Question 18. The criteria to classify a dam as a large dam is __________
  1.    Length of the crest of the dam lesser than 500 m
  2.    Capacity of the reservoir less than 1 million cubic meters
  3.    Maximum flood discharge less than 2000 cubic meters/second
  4.    Capacity of the reservoir not less than 1 million cubic meters
 Discuss Question
Answer: Option D. -> Capacity of the reservoir not less than 1 million cubic meters
Answer: (d).Capacity of the reservoir not less than 1 million cubic meters
Question 19. A solid barrier constructed at a suitable location across a river valley to impound water is called __________
  1.    Reservoir
  2.    Dam
  3.    Bridge
  4.    Retaining wall
 Discuss Question
Answer: Option B. -> Dam
Answer: (b).Dam
Question 20. Which among the following is not an objective for the construction of the dam?
  1.    To make sure rains occur periodically
  2.    Generation of hydropower energy
  3.    Providing water supply for domestic and industrial purposes
  4.    Providing irrigational facilities
 Discuss Question
Answer: Option A. -> To make sure rains occur periodically
Answer: (a).To make sure rains occur periodically