Answer: Option A. -> alluvial canal
Answer: (a).alluvial canal
Answer: (a).alluvial canal
Answer: Option D. -> Contour canal – provision of cross drainage works is not required
Answer: (d).Contour canal – provision of cross drainage works is not required
Answer: (d).Contour canal – provision of cross drainage works is not required
Answer: Option D. -> To decelerate the silting process low submersible spurs may be constructed
Answer: (d).To decelerate the silting process low submersible spurs may be constructed
Answer: (d).To decelerate the silting process low submersible spurs may be constructed
Answer: Option D. -> Breaches in a big canal – Dumping huge quantity of earth
Answer: (d).Breaches in a big canal – Dumping huge quantity of earth
Answer: (d).Breaches in a big canal – Dumping huge quantity of earth
Answer: Option B. -> False
Answer: (b).False
Answer: (b).False
Answer: Option A. -> a horizontal strip at the N.S.L
Answer: (a).a horizontal strip at the N.S.L
Answer: (a).a horizontal strip at the N.S.L
Answer: Option A. -> True
Answer: (a).True
Answer: (a).True
Answer: Option C. -> Volumetric Method of Pricing
Answer: (c).Volumetric Method of Pricing
Answer: (c).Volumetric Method of Pricing
Answer: Option C. -> Economic Considerations
Answer: (c).Economic Considerations
Answer: (c).Economic Considerations
Answer: Option B. -> 2
Answer: (b).2
Answer: (b).2