Question 691. To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as
  1.    bat
  2.    header
  3.    stretcher
  4.    closer.
 Discuss Question
Answer: Option D. -> closer.
Answer: (d).closer.
Question 692. The form work from the slabs excluding props, can be removed only after
  1.    1 day
  2.    4 days
  3.    7 days
  4.    14 days
 Discuss Question
Answer: Option B. -> 4 days
Answer: (b).4 days
Question 693. The pile provided with one or more bulles in its vertical shaft, is generally known as
  1.    under-ream pile
  2.    friction pile
  3.    bearing pile
  4.    sheet pile.
 Discuss Question
Answer: Option A. -> under-ream pile
Answer: (a).under-ream pile
Question 694. The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is
  1.    10 cm
  2.    15 cm
  3.    20 cm
  4.    25 cm
 Discuss Question
Answer: Option C. -> 20 cm
Answer: (c).20 cm
Question 695. The concrete slump recommended for foundations, is
  1.    25 to 50 mm
  2.    30 to 125 mm
  3.    50 to 100 mm
  4.    75 to 125 mm
 Discuss Question
Answer: Option C. -> 50 to 100 mm
Answer: (c).50 to 100 mm
Question 696. To construct a 10 cm thick partition wall, you will prefer
  1.    English bond
  2.    Flemish bond
  3.    Header bond
  4.    Stretcher bond.
 Discuss Question
Answer: Option D. -> Stretcher bond.
Answer: (d).Stretcher bond.
Question 697. The voussoir placed at crown of an arch, is known as a
  1.    key
  2.    soffit
  3.    springer
  4.    haunch.
 Discuss Question
Answer: Option A. -> key
Answer: (a).key
Question 698. The vertical members fixed between steps and hand rail, are known
  1.    balusters
  2.    strings
  3.    newel posts
  4.    soffits.
 Discuss Question
Answer: Option A. -> balusters
Answer: (a).balusters
Question 699. The pile which supports the load due to friction between pile face and surrounding soil, is generally known as
  1.    bearing pile
  2.    friction pile
  3.    sheet pile
  4.    battered pile.
 Discuss Question
Answer: Option B. -> friction pile
Answer: (b).friction pile
Question 700. Pick up the consideration to the taken while designing a hospital from the following :
  1.    the operation theatre unit to be detached as it requires sterlized zone but near the ward for the patients and doctor
  2.    the mortuary should be detached from the main circulation with a postmortem room
  3.    causalty unit should be provided a separate entrance
  4.    all the above.
 Discuss Question
Answer: Option D. -> all the above.
Answer: (d).all the above.