Question
The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.
Answer: Option B
Answer: (b).20-40
Was this answer helpful ?
Answer: (b).20-40
Was this answer helpful ?