A major difference between the procedure of construction in bored piles and cast-in-situ driving piles is ___________
Options:
A .  Driving equipment
B .  Method of driving
C .  Concrete filling
D .  None of the mentioned
Answer: Option A
Answer: (a).Driving equipment