If the budgeted fixed cost is $40000 and budgeted fixed cost is $16 per unit, then budgeted denominator level will be
Options:
A .  3500 units
B .  2500 units
C .  3900 units
D .  4900 units
Answer: Option B
Answer: (b).2500 units