Question
A 4 m diameter tunnel has been constructed through an earthen dam with a bell mouth entry. The water levels on the U/s and D/s sides of the dam are at RL 226 m and 210 m respectively. What will be the discharge through this outlet?
Answer: Option C
Answer: (c).165 cumecs
Was this answer helpful ?
Answer: (c).165 cumecs
Was this answer helpful ?
Submit Solution