Question


To build a house at a faster pace, the contractor increases the wages/ hour of each worker by 20%  and the working hours by 25% . By how much percent has the daily earnings of each labourer increased?


Options:
A .   20%
B .   25%
C .   30%
D .   50%
Answer: Option D
:
D

Solve using assumption


Lets say the number of hours / day initially = 10 and the wages = Rs 100 for 10 hours


 Wages / hour = 10010 = 10/hr


Earnings initially = 100 for 10 hours


New wages =  1.2×10  = 12 / hr


New number of hours =  1.25×10   = 12.5 hours


New earnings = 12×12.5   = 150
% change =50100×100=50% , Option (4).


2nd method:-  Wages(w)=no.ofhours(h)×wages/hour(p)


W2W1=h2×p2h1×p1=1.25h1×1.2p1h1×p1=1.2×1.25=1.5


  F.O.M = 1.5   i.e  %  increase = 50%. Option (4) .


 