Border Roads Organisation conducts final blast concluding all excavation on Sela Tunnel Project. Where is Sela Tunnel?
Options:
A .  Arunachal Pradesh
B .  Maharashtra
C .  West Bengal
D .  Tamil Nadu
Answer: Option A

The final blast for the 980-metre long Sela Tunnel (Tunnel 1) was conducted by Director General Border Roads (DGBR) Lt Gen Rajeev Chaudhry. The Sela Tunnel Project is located in the West Kameng District of Arunachal Pradesh.