Answer: Option C. -> 7.5 m or so
Answer: (c).7.5 m or so
Answer: (c).7.5 m or so
Answer: Option B. -> special flared inlet of the shaft spillway of a large dam project
Answer: (b).special flared inlet of the shaft spillway of a large dam project
Answer: (b).special flared inlet of the shaft spillway of a large dam project
Answer: Option A. -> True
Answer: (a).True
Answer: (a).True
Answer: Option C. -> radial gates
Answer: (c).radial gates
Answer: (c).radial gates
Answer: Option D. -> Four
Answer: (d).Four
Answer: (d).Four
Answer: Option B. -> Inverted U-shape
Answer: (b).Inverted U-shape
Answer: (b).Inverted U-shape
Answer: Option C. -> a sloping apron below the downstream river bed
Answer: (c).a sloping apron below the downstream river bed
Answer: (c).a sloping apron below the downstream river bed
Answer: Option B. -> a ski-jump bucket
Answer: (b).a ski-jump bucket
Answer: (b).a ski-jump bucket
Answer: Option A. -> True
Answer: (a).True
Answer: (a).True
Answer: Option C. -> morning glory
Answer: (c).morning glory
Answer: (c).morning glory