Question 31. According to SMART goals, what does the letter ‘R’ refer to?
  1.    Realistic
  2.    Range
  3.    Refrain
  4.    Retain
 Discuss Question
Answer: Option A. -> Realistic
Answer: (a).Realistic
Question 32. According to SMART goals, what does the letter ‘T’ refer to?
  1.    Time-based
  2.    Train
  3.    Tough
  4.    Try
 Discuss Question
Answer: Option A. -> Time-based
Answer: (a).Time-based
Question 33. SMED stands for Single-Minute Exchange of Dies.
  1.    True
  2.    False
  3.    May be True or False
  4.    Can't say
 Discuss Question
Answer: Option A. -> True
Answer: (a).True
Question 34. Which of the following is not a benefit of SMED?
  1.    Lower manufacturing cost
  2.    Smaller lot sizes
  3.    Lower inventory levels
  4.    Larger lot sizes
 Discuss Question
Answer: Option D. -> Larger lot sizes
Answer: (d).Larger lot sizes
Question 35. SMED aims to convert as many changeover steps as possible to external elements.
  1.    True
  2.    False
  3.    May be True or False
  4.    Can't say
 Discuss Question
Answer: Option A. -> True
Answer: (a).True
Question 36. Which of the following is a workplace efficiency tool designed to combine product flow and information flow along with any other useful data?
  1.    5S
  2.    Seven Wastes
  3.    Value Stream Mapping
  4.    Poka-Yoke
 Discuss Question
Answer: Option C. -> Value Stream Mapping
Answer: (c).Value Stream Mapping
Question 37. Which of the following is a tool utilized to visually map the flow of production?
  1.    Gemba
  2.    Automation
  3.    Value Stream Mapping
  4.    Benchmarking
 Discuss Question
Answer: Option C. -> Value Stream Mapping
Answer: (c).Value Stream Mapping
Question 38. P-Kanban is also known as Production Kanban.
  1.    True
  2.    False
  3.    May be True or False
  4.    Can't say
 Discuss Question
Answer: Option A. -> True
Answer: (a).True
Question 39. Calculate number of Kanbans if the hourly demand is 200 units, lead time is 12 hours, container capacity is 144 units, and variation in lead time is 15%.
  1.    23
  2.    22
  3.    21
  4.    20
 Discuss Question
Answer: Option D. -> 20
Answer: (d).20
Question 40. Which of the following is not an example of visual factory tools?
  1.    Visual indicators
  2.    Visual displays
  3.    Visual controls
  4.    Benchmarking
 Discuss Question
Answer: Option D. -> Benchmarking
Answer: (d).Benchmarking