Question 11. Abbreviated work factor data is applied for
  1.    Material handling operation
  2.    Maintenance operation
  3.    Packing and shipping operation
  4.    All of these
 Discuss Question
Answer: Option D. -> All of these
Question 12. The type of layout used for manufacturing steam turbines, is
  1.    Product layout
  2.    Process layout
  3.    Fixed position layout
  4.    Any one of these
 Discuss Question
Answer: Option C. -> Fixed position layout
Question 13. The allowed time for a job equals standard time plus
  1.    Policy allowance
  2.    Interference allowance
  3.    Process allowance
  4.    Learning allowance
 Discuss Question
Answer: Option A. -> Policy allowance
Question 14. The type of organisation preferred for a steel industry, is
  1.    Line organisation
  2.    Functional organisation
  3.    Line and staff organisation
  4.    Line, staff and functional organisation
 Discuss Question
Answer: Option D. -> Line, staff and functional organisation
Question 15. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is
  1.    0.50
  2.    0.66
  3.    0.84
  4.    0.95
 Discuss Question
Answer: Option C. -> 0.84
Question 16. The bonus increases in proportion to the increase in efficiency. This statement applies to
  1.    Halsey plan
  2.    Gantt plan
  3.    Emerson's efficiency plan
  4.    Rowan plan
 Discuss Question
Answer: Option C. -> Emerson's efficiency plan
Question 17. Critical path on PERT/CPM chart is obtained by joining the events having
  1.    Maximum slack
  2.    Minimum slack
  3.    Average slack
  4.    No slack
 Discuss Question
Answer: Option B. -> Minimum slack
Question 18. Critical path method
  1.    Helps in ascertaining time schedules
  2.    Makes better and detailed planning possible
  3.    Provides a standard method for communicating project plans schedules and to time and cost performance
  4.    All of the above
 Discuss Question
Answer: Option D. -> All of the above
Question 19. The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is known as
  1.    Duration
  2.    Total float
  3.    Free float
  4.    Interfering float
 Discuss Question
Answer: Option C. -> Free float
Question 20. The standard time for a job is
  1.    Total work content
  2.    Base time + relaxation time
  3.    Total work content + basic time
  4.    Total work content + delay contingency allowance
 Discuss Question
Answer: Option D. -> Total work content + delay contingency allowance