Question 11. Basic motion time study gives times for basic motions in ten thousandths of
  1.     Second
  2.     Minute
  3.     Hour
  4.     Day
 Discuss Question
Answer: Option B. ->  Minute
Explanation :
Question 12. Which of the following is independent of sales forecast?
  1.     Productivity
  2.     Inventory control
  3.     Production planning
  4.     Production control
 Discuss Question
Answer: Option A. ->  Productivity
Explanation :
Question 13. The product layout
  1.     Lowers overall manufacturing time
  2.     Requires less space for placing machines
  3.     Utilizes machine and labour better
  4.     All of these
 Discuss Question
Answer: Option D. ->  All of these
Explanation :
Question 14. The critical activity has
  1.     Maximum float
  2.     Minimum float
  3.     Zero float
  4.     Average float
 Discuss Question
Answer: Option C. ->  Zero float
Explanation :
Question 15. The value engineering technique in which experts of the same rank assemble for product development is called
  1.     Delphi
  2.     Brain storming
  3.     Morphological analysis
  4.     Direct expert comparison
 Discuss Question
Answer: Option B. ->  Brain storming
Explanation :
Question 16. What does symbol 'o' imply in work study?
  1.     Operation
  2.     Inspection
  3.     Transport
  4.     Delay/temporary storage
 Discuss Question
Answer: Option A. ->  Operation
Explanation :
Question 17. Break-even analysis consists of
  1.     Fixed cost
  2.     Variable cost
  3.     Fixed and variable costs
  4.     Operation costs
 Discuss Question
Answer: Option C. ->  Fixed and variable costs
Explanation :
Question 18. M.t.m. is used to
  1.     Improve existing methods
  2.     Establish time standards
  3.     Develop effective methods in advance of the beginning of production
  4.     All of the above
 Discuss Question
Answer: Option D. ->  All of the above
Explanation :
Question 19. Pert analysis is based on
  1.     Optimistic time
  2.     Pessimistic time
  3.     Most likely time
  4.     All of the above
 Discuss Question
Answer: Option D. ->  All of the above
Explanation :
Question 20. The probabilistic time is given by (where to = optimistic time, tp = pessimistic time, and tn = most likely time)
  1.     (to + tp + tn)/3
  2.     (to + 2tp + tn)/4
  3.     (to + 4tp + tn)/5
  4.     (to + tp + 4tn)/6
 Discuss Question
Answer: Option D. ->  (to + tp + 4tn)/6