MCQs
Total Questions : 163
| Page 1 of 17 pages
Answer: Option C. -> back flush costing
Answer: (c).back flush costing
Answer: (c).back flush costing
Answer: Option D. -> trigger point
Answer: (d).trigger point
Answer: (d).trigger point
Answer: Option B. -> economic order quantity
Answer: (b).economic order quantity
Answer: (b).economic order quantity
Answer: Option C. -> $4.20
Answer: (c).$4.20
Answer: (c).$4.20
Answer: Option C. -> lean accounting
Answer: (c).lean accounting
Answer: (c).lean accounting
Answer: Option B. -> 16.67 per piece
Answer: (b).16.67 per piece
Answer: (b).16.67 per piece
Answer: Option D. -> both a and b
Answer: (d).both a and b
Answer: (d).both a and b
Answer: Option A. -> actual manufacturing overhead rate
Answer: (a).actual manufacturing overhead rate
Answer: (a).actual manufacturing overhead rate
Answer: Option B. -> cost pool
Answer: (b).cost pool
Answer: (b).cost pool
Answer: Option B. -> over allocated indirect cost
Answer: (b).over allocated indirect cost
Answer: (b).over allocated indirect cost