CHAPTER 3 : SINTER PLANT MCQs
Total Questions : 5
Answer: Option A. -> 1350
Answer: Option D. -> SP
Answer: Option D. -> combustion
Answer: Option A. -> 5-40 mm
The sinter cake is then crushed, screened, cooled and dispatched to Blast furnace. The ideal
size of sinter required in blast furnace is in between 5mm to 40mm. T
Answer: Option A. -> 6