MCQs
Total Questions : 1601
| Page 71 of 161 pages
Answer: Option A. -> 1 day
Answer: (a).1 day
Answer: (a).1 day
Answer: Option D. -> all the above.
Answer: (d).all the above.
Answer: (d).all the above.
Answer: Option D. -> stretcher bond is generally used for the construction of brick corbel.
Answer: (d).stretcher bond is generally used for the construction of brick corbel.
Answer: (d).stretcher bond is generally used for the construction of brick corbel.
Answer: Option D. -> all of these.
Answer: (d).all of these.
Answer: (d).all of these.
Answer: Option D. -> all the above.
Answer: (d).all the above.
Answer: (d).all the above.
Answer: Option A. -> reverberation
Answer: (a).reverberation
Answer: (a).reverberation
Answer: Option B. -> moist clay
Answer: (b).moist clay
Answer: (b).moist clay
Answer: Option D. -> all the above.
Answer: (d).all the above.
Answer: (d).all the above.
Answer: Option C. -> In English bond, stretchers are laid in every course
Answer: (c).In English bond, stretchers are laid in every course
Answer: (c).In English bond, stretchers are laid in every course
Answer: Option D. -> All of these.
Answer: (d).All of these.
Answer: (d).All of these.