Question 1. In pert analysis, critical path is obtained by joining events having
  1.     +ve slack
  2.     -ve slack
  3.     Zero slack
  4.     Dummy activities
Answer: Option C
Explanation :

Question 2. Pert has following time estimate
  1.     One time estimate
  2.     Two time estimate
  3.     Three time estimate
  4.     Four time estimate
Answer: Option C
Explanation :

Question 3. The routing function in a production system design is concerned with
  1.     Manpower utilization
  2.     Quality assurance of the product
  3.     Machine utilization
  4.     Optimizing material flow through the plant
Answer: Option C
Explanation :

Question 4. Pert has following time estimate
  1.     One time estimate
  2.     Two time estimate
  3.     Three time estimate
  4.     Four time estimate
Answer: Option C
Explanation :

Question 5. In pert analysis, critical path is obtained by joining events having
  1.     +ve slack
  2.     -ve slack
  3.     Zero slack
  4.     Dummy activities
Answer: Option C
Explanation :

Question 6. Cpm has following time estimate
  1.     One time estimate
  2.     Two time estimate
  3.     Three time estimate
  4.     Four time estimate
Answer: Option A
Explanation :