Pick up the correct statement from the following:
Options:
A .  In order to check up the average depth of excavation, 'Dead man’s' are left at the mid-widths of borrow pits
B .  The earthwork calculation in excavation is made from the difference in levels obtained with a level
C .  The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
D .  All the above
Answer: Option D