Question: A pre-stressed concrete pile is
Options:
A. Easy to handle
B. Lighter in weight
C. Extremely durable
D. All the above
Answer: Option D

Submit Answer & Explaination

Earn Reward Points by submitting Detailed Explaination for this Question

More Questions on This Topic :

Question 1. As compared to stretcher course, the thickness of joints in header course should be
  1.     Less
  2.     More
  3.     Equal
  4.     Equal or more
Answer: Option A
Question 2. Herringbone bond is used for
  1.     Walls having thickness more than 4 bricks
  2.     Architectural finish to the face work
  3.     Ornamental panels in brick flooring
  4.     All the above
Answer: Option D
Question 3. Brick nogging type of partition wall, is constructed by
  1.     Laying bricks as stretchers in cement mortar
  2.     Laying bricks as headers in cement mortar
  3.     Reinforcing brick wall with iron straps
  4.     Constructing brick work within a wooden framework
Answer: Option D
Question 4. The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called
  1.     Half brick
  2.     Queen closer
  3.     King closer
  4.     Bevelled closer
Answer: Option B
Question 5. Single flemish bond consists of
  1.     Double Flemish bond facing and English bond backing in each course
  2.     English bond facing and double Flemish bond backing in each course
  3.     Stretcher bond facing and double Flemish bond backing in each course
  4.     Double Flemish bond facing and header bond backing in each course
Answer: Option A
Question 6. Single flemish bond consists of
  1.     Double Flemish bond facing and English bond backing in each course
  2.     English bond facing and double Flemish bond backing in each course
  3.     Stretcher bond facing and double Flemish bond backing in each course
  4.     Double Flemish bond facing and header bond backing in each course
Answer: Option A

Check all Questions in this Topic : Click HERE